Invoice

From:

742 Burys Green Road
Bobcaygeon ON K0M1A0

info@hhpropertymanagement.ca
HST - 77079 1200

Invoice Number INV-0588
Invoice Date 24.11.25
Due Date 24.12.25
Total Due $2,475.00
To:
Heather

234 O'Riley Ln , Little Britain , ON k9V4R4

Hrs/Qty Service Rate/PriceAdjustSub Total
1 12x20 Carport Lean To

dig and set three 6x6 Post and Beam attached to concrete Footings roughly 3-4 ft in depth with simpson post saddle along east side of home spaced apart 6-8 feet

Roof to be sized for Ontario snow load per the Ontario building code

Car port

12' Span from house to front beam x 20' length along house

rafter spacing 24" on center

front support beam across the 12 ' span supported by 3 6x6 post

ledger attached to house . it will be flashed and lagged into rim joist/blocking
ledger - 2x 2x8 spliced using lag bolts
front beam 2x10 doubled
11 rafters 2x8 legth 13 ft possible 14 ft for over hang

roof sheathing : 8-10 sheets of 4x8 exterior plywood

fascia /trim 1x6 or 1x8 as desidered

blocking - 2x4 for bracing and blocking

all wood to be pressure treated PT sienna

shingles and color to match exisiting home as best to our ability - they may not make those shingles anymore .

rougly needed 8-10 bundles to shingle

1 roll underlayment
3/4 galvanized through bolts
3-1/4" screws
joist hangers may be used depeding on connection method

optional add ons at an agreed price
- gutters and drainage
- white metal flashing for front beam and side beam
- finishing / paint

$7,500.000.00%$7,500.00
Sub Total $7,500.00
GST $975.00
Paid -$6,000.00
Total Due $2,475.00