Quote

From:

742 Burys Green Road
Bobcaygeon ON K0M1A0

info@hhpropertymanagement.ca
HST - 77079 1200

Quote Number QUO-68
Quote Date 4.05.25
Total $10,735.00
To:
Debra Doulaghsingh

1978 Assumption Road

10 percent required to book customer in and set date

40 percent required when 1 week from start date to buy material

20 percent required after deck is completed and time to railing

 

Remainder 30 percent due when job completed

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Foundation Fill

10 yards of quarry pit run (clay gravel rock ) to bring foundation dirt level with window well and corner of home

$700.000%$700.00
1 Top dressing and grass seed

15 yards of top soil followed by 5 yards of compost to help increase grass growth flat rock to be placed in front of landing of stairs middle of deck

$800.000%$800.00
1 Deck and railing construction

PT Sienna deck and joist

Deck to be constructed roughly 12 ft by 24 ft with a 1 ft lower lower level coming out of backdoor roughly 4x 12 with a 4 ft wide step up to side of deck and off to backyard

Roughly 12x20 deck to be built with a cut out for septic tank .
Deck to have PT Sienna railing and black pickets along the front with a 4 to 5 ft wide stairs in the center with railings on both sides going down to flat rock . Left side of deck to have 12 x6 high privacy fence with 2 ft lattice on top .

$8,000.000.00%$8,000.00
Sub Total $9,500.00
GST $1,235.00
Total $10,735.00