742 Burys Green Road
Bobcaygeon ON K0M1A0
info@hhpropertymanagement.ca
HST - 77079 1200
| Quote Number | QUO-68 |
| Quote Date | 4.05.25 |
| Total | $10,735.00 |
1978 Assumption Road
10 percent required to book customer in and set date
40 percent required when 1 week from start date to buy material
20 percent required after deck is completed and time to railing
Remainder 30 percent due when job completed
| Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
|---|---|---|---|---|
| 1 | Foundation Fill 10 yards of quarry pit run (clay gravel rock ) to bring foundation dirt level with window well and corner of home |
$700.00 | 0% | $700.00 |
| 1 | Top dressing and grass seed 15 yards of top soil followed by 5 yards of compost to help increase grass growth flat rock to be placed in front of landing of stairs middle of deck |
$800.00 | 0% | $800.00 |
| 1 | Deck and railing construction PT Sienna deck and joist Deck to be constructed roughly 12 ft by 24 ft with a 1 ft lower lower level coming out of backdoor roughly 4x 12 with a 4 ft wide step up to side of deck and off to backyard Roughly 12x20 deck to be built with a cut out for septic tank . |
$8,000.00 | 0.00% | $8,000.00 |
| Sub Total | $9,500.00 |
| GST | $1,235.00 |
| Total | $10,735.00 |