Quote

From:

742 Burys Green Road
Bobcaygeon ON K0M1A0

info@hhpropertymanagement.ca
HST - 77079 1200

Quote Number QUO-62
Quote Date 14.10.24
Total $5,085.00
To:
Paragon Drywall

59 Romania Drive, Suite 201 Concord , ON

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Dock Build and Install

Design and construct PT Sienna Dock roughly 5-6 ft x 10 ft dock extension and attach it to existing dock with Pins and brackets purchased from Naylor Dock Systems
Dock will consist of 4 posts with 4 angle corner brackets and 4 base plates for the poles. All hardware to be purchased from Naylor Dock Systems

The dock will be designed with removable panels so uninstalling and installing will make it much easier for the years to come

All wood to be purchased from Monaghan lumber

$4,500.000.00%$4,500.00
Sub Total $4,500.00
GST $585.00
Total $5,085.00